Ideematec is supplying its safeTrack Horizon system for a 50 MW project in Spain.

With reception of the NTP, the company was able to secure an early entry into its neighboring country’s PPA market.

The 90 hectar solar field in the southwestern part of Spain is destined to produce 99 GW hours of clean energy in the future.

„The design benefits of our decentralized 2P Designs, which are a result of the patented load decoupled drive unit, contribute significantly to BOS and OPEX reductions.“
– Klaus Plecher VP Engineering